2017/02/13 By Paul Jeffries

Ramboll Leadership Conference 2017 Bridge

For the 2017 Ramboll Leadership Conference in Copenhagen, which took place on the 22nd and 23rd of January, RCD was involved in a collaboration between the Transport and Buildings departments to design and construct a 'bridge' installation between their respective stands.  We had a little over a...
For the 2017 Ramboll Leadership Conference in Copenhagen, which took place on the 22nd and 23rd of January, RCD was involved in a collaboration between the Transport and Buildings departments to design and construct a 'bridge' installation between their respective stands.  We had a little over a...

2015/02/21 By Anders Dyrelund, Energy strategy and planning, Energy

Two Energy World Records in Vojens

                                    The town Vojens is known all over the world for Vojens Speedway Center, starting with Ole Olsen, world champion se...

2016/12/14 By Paul Jeffries

Parametric Engineering Course at Imperial College London

From January 2017, Imperial College London will be running an evening course on Parametric Engineering, co-taught by RCD lead Paul Jeffries.  The course will cover the application of Rhino and Grasshopper for computational design within an engineering context and is open to anybody in full time ...
From January 2017, Imperial College London will be running an evening course on Parametric Engineering, co-taught by RCD lead Paul Jeffries.  The course will cover the application of Rhino and Grasshopper for computational design within an engineering context and is open to anybody in full time ...

2016/12/01 By Paul Jeffries

What is Computational Design?

If you've arrived at this blog, you will probably have had some exposure to the concept of 'computational design'.  You may also have heard some of the related terms that fall under this heading - 'parametric design', 'algorithmic design', 'generative design' and so on.  As computational design...
If you've arrived at this blog, you will probably have had some exposure to the concept of 'computational design'.  You may also have heard some of the related terms that fall under this heading - 'parametric design', 'algorithmic design', 'generative design' and so on.  As computational design...

2016/04/25 By Andreas Wettre

Du kan ikke planlegge kreativitet og innovasjon

En grunnleggende antagelse i den dominerende tenkningen i dag er at det er mulig å redusere, kontrollere eller få oversikt over menneskelig samhandling, og bidra til å skape forutsigbare handlingsmønstre ut av komplekse, uoversiktlige og ukontrollerbare organisasjonsvirkeligheter.

Man tenk...
En grunnleggende antagelse i den dominerende tenkningen i dag er at det er mulig å redusere, kontrollere eller få oversikt over menneskelig samhandling, og bidra til å skape forutsigbare handlingsmønstre ut av komplekse, uoversiktlige og ukontrollerbare organisasjonsvirkeligheter. Man tenk...

2016/04/18 By Alice Bond

Chestnut Grove Academy Science Fair

Chestnut Grove Academy in Balham hosted a Science Fair on the 22nd of March, for their Year 9 students (13/14 year old). Ramboll was represented by two graduate engineers, Neophytos Yiannakou and Mohamed Saleh. It was a great opportunity for the students to get familiar with the work we do at Ram...
Chestnut Grove Academy in Balham hosted a Science Fair on the 22nd of March, for their Year 9 students (13/14 year old). Ramboll was represented by two graduate engineers, Neophytos Yiannakou and Mohamed Saleh. It was a great opportunity for the students to get familiar with the work we do at Ram...

2011/08/08 By Susanne Kalmar Pedersen

How is the Fehmarn tunnel constructed underwater?

This post will describe how a tunnel, consisting of 79 standard elements and 10 special elements, will be immersed and assembled under water.

The construction phase begins with the dredging (digging underwater) of the trench where after a gravel layer will be placed on the bottom of the excava...
This post will describe how a tunnel, consisting of 79 standard elements and 10 special elements, will be immersed and assembled under water. The construction phase begins with the dredging (digging underwater) of the trench where after a gravel layer will be placed on the bottom of the excava...