dcsimg
blog.ramboll.com

2016/04/25 By Andreas Wettre

Du kan ikke planlegge kreativitet og innovasjon

En grunnleggende antagelse i den dominerende tenkningen i dag er at det er mulig å redusere, kontrollere eller få oversikt over menneskelig samhandling, og bidra til å skape forutsigbare handlingsmønstre ut av komplekse, uoversiktlige og ukontrollerbare organisasjonsvirkeligheter.

Man tenk...
En grunnleggende antagelse i den dominerende tenkningen i dag er at det er mulig å redusere, kontrollere eller få oversikt over menneskelig samhandling, og bidra til å skape forutsigbare handlingsmønstre ut av komplekse, uoversiktlige og ukontrollerbare organisasjonsvirkeligheter. Man tenk...

2016/04/18 By Alice Bond

Chestnut Grove Academy Science Fair

Chestnut Grove Academy in Balham hosted a Science Fair on the 22nd of March, for their Year 9 students (13/14 year old). Ramboll was represented by two graduate engineers, Neophytos Yiannakou and Mohamed Saleh. It was a great opportunity for the students to get familiar with the work we do at Ram...
Chestnut Grove Academy in Balham hosted a Science Fair on the 22nd of March, for their Year 9 students (13/14 year old). Ramboll was represented by two graduate engineers, Neophytos Yiannakou and Mohamed Saleh. It was a great opportunity for the students to get familiar with the work we do at Ram...

2011/08/08 By Susanne Kalmar Pedersen

How is the Fehmarn tunnel constructed underwater?

This post will describe how a tunnel, consisting of 79 standard elements and 10 special elements, will be immersed and assembled under water.

The construction phase begins with the dredging (digging underwater) of the trench where after a gravel layer will be placed on the bottom of the excava...
This post will describe how a tunnel, consisting of 79 standard elements and 10 special elements, will be immersed and assembled under water. The construction phase begins with the dredging (digging underwater) of the trench where after a gravel layer will be placed on the bottom of the excava...

2011/08/26 By Susanne Kalmar Pedersen

The construction of the Fehmarn tunnel

This blog post will pick up the underwater construction process where the last blog post left off. In the previous blog I explained how the trench was dredged, the element immersed and afterwards joined with the previously installed element; The bulkheads between the elements being removed to com...
This blog post will pick up the underwater construction process where the last blog post left off. In the previous blog I explained how the trench was dredged, the element immersed and afterwards joined with the previously installed element; The bulkheads between the elements being removed to com...

2012/10/10 By Susanne Kalmar Pedersen

Prequalification for the Fehmarnbelt tunnel is a milestone for the project

I apologise for the blog being a bit quiet for a long time. It has been a very busy period for us where we have worked on three parallel processes: Preparation of the tender document and technical support to the Environmental Impact Assessment (EIA) in Denmark and in Germany.

Lately, the bigg...
I apologise for the blog being a bit quiet for a long time. It has been a very busy period for us where we have worked on three parallel processes: Preparation of the tender document and technical support to the Environmental Impact Assessment (EIA) in Denmark and in Germany. Lately, the bigg...

2012/11/12 By Susanne Kalmar Pedersen

This is how the Fehmarn belt tunnel project will be divided in contracts

Right now we continue our work on preparing the tender document and technical support for the Environmental Impact Assessment (EIA) in Denmark and in Germany. This time though, I will follow up on the four main contracts of the Fehmarn belt tunnel project and elaborate on the competitive dialogue...
Right now we continue our work on preparing the tender document and technical support for the Environmental Impact Assessment (EIA) in Denmark and in Germany. This time though, I will follow up on the four main contracts of the Fehmarn belt tunnel project and elaborate on the competitive dialogue...

2016/02/01 By Alice Bond

Students Inspired by Foundation Event

On the 17th December 60 year 11 and 12 students visited Ramboll's London Office to take part in a series of activities in aide of inspiring them to tackle the world’s challenges and following a career in engineering. The day was organised with the Inspiring Futures Foundation, of which Rambol...
On the 17th December 60 year 11 and 12 students visited Ramboll's London Office to take part in a series of activities in aide of inspiring them to tackle the world’s challenges and following a career in engineering. The day was organised with the Inspiring Futures Foundation, of which Rambol...