Tuesday 17th January – final module moved to VIa

We got the B1 module line and levelled. We then travelled back to site VI to move the final B2 module. We took the normal rigging team and to celebrate moving the last module they joined myself and Oli inside for the re-location journey.  Spirits were high so we popped on comedy wigs from the dressing up box stored in the module, and waved goodbye to site VI from the rear fire escape.

We brought along some snacks and played music and chatted the entire 4 or so hours.

When we arrived at the other end there was lots of whooping, as the chief engineer counted in the last module. We all made it down the fire escape ladder and wandered over to the temporary camp to continue celebrating the re-location success.  The team were in high spirits, we eventually turned in around 4am.